Saturday, April 4, 2009

~ Bridal Album ~

*Sigh* the designer make so much mistake that we went down to the bridal shop 3 times to look at the bridal album design. The 3rd time that we went down there's still some minor mistake. Roland so paiseh that he say the last design he will email me for approval. 

It's super low res pix but I got one page of design for "sneak-preview" hahahha....

Friday, April 3, 2009

Checklist update

Things to be done for our wedding:
  1. Collect wedding card
  2. Confirm wedding album design
  3. Print wedding card
  4. Food tasting (End Mar/Early Apr) => 30th Mar 2009
  5. Send wedding invitation (Apr)
  6. Collect wedding album (End Apr)
  7. Guo Da Li stuff (Mid/End Apr)
  8. Book Mani & Pedi appt
  9. Facial appt
  10. Video Montage (End Apr)
  11. DIY Jie Meis' corsage & pens (End Apr)
  12. Confirm time with videographer & photographer (2wks before)
  13. Final fitting => 09 May 2009
  14. Meetup with jie meis (End Apr)
  15. Confirm itineary
  16. Music for march-in & etc...
  17. MCs & speech
Things to be done for our love nest:
  1. Renovation Loan
  2. Contractor
  3. Carpentary
  4. Sink & basin
  5. Buy toilet accessories
  6. Furnitures (Study room tables, TV console, dinning table, dressing table)
  7. Electronics (Cooker hobs, washing machine, fridge, oven, iron, TV, electic airpot, rice cooker)
  8. Ceiling Fans
  9. Mattress & pillows
  10. Change window film & locks

~ Colors of Love Nest ~

It's day 23 of renovation. Is it that every renovation there will be hipcup? Initially we don't want to install aircon cos our is very windy and in a long run it's nt economical... Well... when hubbie aunts know about it... they inisiting that we should install and they will give it as a house gift for us. So when the renovation is about to complete, the aircon has to come in and everything was put on halted.

Yesterday, I was at our love nest the whole day to wait for the aircon to be installed and also to wait for the delivery of our toilets necessities.

The house will be paint today... later go and take some photos to post on the blog. After the painting is done, lightings will go up and then cleaning of the house before the carpentary goes in.

These are the colors of our love nest.


White Ice for
study & bedroom 2


Soft Sky for
Master room


Lilac Lace for
Living Room

Tuesday, March 24, 2009

~ Renovation Day 14 ~

Today (24 Mar 2009) is day 14 of renovation. We past the first cheque to our contractor, Uncle Albert Lee and he told us that the flooring for the living room is done, we can go up to take a look.

So we went up to our love nest. The living room flooring is about 75% done. The kitchen wall tile is done. This is how my kitchen looks like.



The toilets flooring is done too. The common toilets are designed such that our guest will not have to take our socks. Brilliant idea by my hubbie! hehe maybe need to "patent" it :P


The L-Box for the living room are also up. =)

Friday, March 20, 2009

~ Renovation Updates ~

After dragging for so long, renovation finally started. The permit was approved on 11 March 2009 and expected completion date is 08 April 2009. 

Day 1 (11-03-09): 
Hacking work can only be done on 16, 17 and 18 March 2009, so the workers start dismantling the old cabinets.

Day 2 (12-03-09): 
Old pipings were replaced with stainless steel pipes. The cornicles were removed. Basin and W.C were removed.

Day 3 (13-03-09): 
Old wires were removed and the doors were removed too.

Day 4(14-03-09) :
The new wires were laid. We went down to Ubi to choose our toilets' bi-fold doors and our wrought iron grilles.

Day 5 (15-03-09):
We went around to inform neighbours that our renovation is going to start on monday.

Day 6 (16-03-09):
Hacking started. The kitchen, toilets and living room tiles were hacked off.

Day 7 (17-03-09):
Hacking completed and all debris removed.

The after hacking pictures:

Our Living Room

Common toilet

Our kitchen

The enlarged kitchen entrance

Bedroom 1

Bedroom 2

Master bedroom


Day 8 (18-03-09):
Our tiles arrived. Everywhere filled with sands and cements.




Day 9 (19-03-09):
New door frame was in place and the opening above the door was plastered. Toilets were waterproof with first layer.

Day 10 (20-03-09):
Kitchen wall tiles 50% up, common toilet wall tiles laid and master toilet wall tiles in progress. Toilets were waterproof with 2nd layer.

Monday, March 9, 2009

~ checklist ~

Things to be done for our wedding:
  1. Collect wedding card
  2. Confirm wedding album design
  3. Print wedding card
  4. Food tasting (End Mar/Early Apr) => 30th Mar 2009
  5. Send wedding invitation (Apr)
  6. Collect wedding album (End Apr)
  7. Guo Da Li stuff (Mid/End Apr)
  8. Book Mani & Pedi appt
  9. Facial appt
  10. Video Montage (End Apr)
  11. DIY Jie Meis' corsage & pens (End Apr)
  12. Confirm time with videographer & photographer (2wks before)
  13. Final fitting
  14. Meetup with jie meis (End Apr)
  15. Confirm itineary
  16. Music for march-in & etc...
  17. MCs & speech
Things to be done for our love nest:
  1. Renovation Loan
  2. Contractor
  3. Carpetary
  4. Sink & basin
  5. Buy toilet accessories
  6. Furnitures (Study room tables, TV console, dinning table, dressing table)
  7. Electronics (Cooker hobs, washing machine, fridge, oven, iron, TV, electic airpot, rice cooker)
  8. Ceiling Fans
  9. Mattress & pillows
  10. Change window film & locks

~Stressed!~

It's nearing mid-march and our love nest has not even started renovation yet! Praying hard that it will be in time for our wedding, all ready to be moved in.

Last week, we settled our renovation loan and managed to get the carpentry quotation and nearly fainted after looking at it. 

We got a resale flat, hence most of our cash flow have already dump into the cash-over-evaluation. Thus, we got to turn to taking a renovation loan to do up our love nest once and for all. It's a 16 yrs old flat and we are the third owner. The house need a major re-wire, hacking all the floors, kitchen and 2 toilets, widen the entrance to the kitchen, and changing all the doors for the house, all these work already amount to $25K, excluding carpentary.

Carpetary work required, kitchen cabinets, shoe cabinet, platform for the living room, fish tank cabinet, feature wall, wardrobe and platform bed. These amount to another $15K. And that exclude buying furnitures and electronics.

*sigh* we definitely got to seat down to do up our budget cos we are only loaning $28K and forking out the rest by ourselves. ~REALLY MONEY NOT ENOUGH!~