~ Renovation Day 14 ~

Today (24 Mar 2009) is day 14 of renovation. We past the first cheque to our contractor, Uncle Albert Lee and he told us that the flooring for the living room is done, we can go up to take a look.

So we went up to our love nest. The living room flooring is about 75% done. The kitchen wall tile is done. This is how my kitchen looks like.



The toilets flooring is done too. The common toilets are designed such that our guest will not have to take our socks. Brilliant idea by my hubbie! hehe maybe need to "patent" it :P


The L-Box for the living room are also up. =)

Friday, March 20, 2009

~ Renovation Updates ~

After dragging for so long, renovation finally started. The permit was approved on 11 March 2009 and expected completion date is 08 April 2009. 

Day 1 (11-03-09): 
Hacking work can only be done on 16, 17 and 18 March 2009, so the workers start dismantling the old cabinets.

Day 2 (12-03-09): 
Old pipings were replaced with stainless steel pipes. The cornicles were removed. Basin and W.C were removed.

Day 3 (13-03-09): 
Old wires were removed and the doors were removed too.

Day 4(14-03-09) :
The new wires were laid. We went down to Ubi to choose our toilets' bi-fold doors and our wrought iron grilles.

Day 5 (15-03-09):
We went around to inform neighbours that our renovation is going to start on monday.

Day 6 (16-03-09):
Hacking started. The kitchen, toilets and living room tiles were hacked off.

Day 7 (17-03-09):
Hacking completed and all debris removed.

The after hacking pictures:

Our Living Room

Common toilet

Our kitchen

The enlarged kitchen entrance

Bedroom 1

Bedroom 2

Master bedroom


Day 8 (18-03-09):
Our tiles arrived. Everywhere filled with sands and cements.




Day 9 (19-03-09):
New door frame was in place and the opening above the door was plastered. Toilets were waterproof with first layer.

Day 10 (20-03-09):
Kitchen wall tiles 50% up, common toilet wall tiles laid and master toilet wall tiles in progress. Toilets were waterproof with 2nd layer.

Monday, March 9, 2009

~ checklist ~

Things to be done for our wedding:
  1. Collect wedding card
  2. Confirm wedding album design
  3. Print wedding card
  4. Food tasting (End Mar/Early Apr) => 30th Mar 2009
  5. Send wedding invitation (Apr)
  6. Collect wedding album (End Apr)
  7. Guo Da Li stuff (Mid/End Apr)
  8. Book Mani & Pedi appt
  9. Facial appt
  10. Video Montage (End Apr)
  11. DIY Jie Meis' corsage & pens (End Apr)
  12. Confirm time with videographer & photographer (2wks before)
  13. Final fitting
  14. Meetup with jie meis (End Apr)
  15. Confirm itineary
  16. Music for march-in & etc...
  17. MCs & speech
Things to be done for our love nest:
  1. Renovation Loan
  2. Contractor
  3. Carpetary
  4. Sink & basin
  5. Buy toilet accessories
  6. Furnitures (Study room tables, TV console, dinning table, dressing table)
  7. Electronics (Cooker hobs, washing machine, fridge, oven, iron, TV, electic airpot, rice cooker)
  8. Ceiling Fans
  9. Mattress & pillows
  10. Change window film & locks

~Stressed!~

It's nearing mid-march and our love nest has not even started renovation yet! Praying hard that it will be in time for our wedding, all ready to be moved in.

Last week, we settled our renovation loan and managed to get the carpentry quotation and nearly fainted after looking at it. 

We got a resale flat, hence most of our cash flow have already dump into the cash-over-evaluation. Thus, we got to turn to taking a renovation loan to do up our love nest once and for all. It's a 16 yrs old flat and we are the third owner. The house need a major re-wire, hacking all the floors, kitchen and 2 toilets, widen the entrance to the kitchen, and changing all the doors for the house, all these work already amount to $25K, excluding carpentary.

Carpetary work required, kitchen cabinets, shoe cabinet, platform for the living room, fish tank cabinet, feature wall, wardrobe and platform bed. These amount to another $15K. And that exclude buying furnitures and electronics.

*sigh* we definitely got to seat down to do up our budget cos we are only loaning $28K and forking out the rest by ourselves. ~REALLY MONEY NOT ENOUGH!~

Wednesday, February 25, 2009

~ Save the date ~

Was in the midst of working out the guest list so that I can send them an electronic invitation to my wedding before mailing them the actual one. 

I'm so worried about guest not turning up and we would end up with empty tables and incurred loss $$$.  **pray hard** With all our money tied down to renovating our house, we don't much to spare =(

I did a "Save this date for us" for the email. Sneak preview for the followers of my blog. Would be sending out the e-invitation next week =P


Print Wedding Cards

Another 2 months plus will be our BIG day and we haven't even print our wedding cards! I emailed my wedding coordinator Sen but she didn't reply my emails after a week usually she was quite fast. I checkout the package she sent me and found a name card inside. Opps! I missed that out when I first receive the package. 

I checked out SingaporeBrides website and realise Sen was actually on maternity leave hence wendy is covering her.  Read a good review about a banquet manager handling the wedding event. I would want to request for him to handle mine :P

I contacted Wendy to settle the collection of my wedding cards. I requested for 300 copies though we were only entitled to 70% of the estimated tables. Wendy was very nice to commodated my request. =) **grinz** I contacted the printers for quotation. The 2 printers provided by Marina Mandarin is Javsy and Kentrich. 

Javsy's pricing: $90 for the first 200 pcs and thereafter $0.20 per copy so for 300 inserts it would cost me $110

Kentrich gave me a direct quotation of $105 for 300 inserts.

Remember reading in the forum that one of the bride manage to get a quotation of $85 for print of 300 inserts. Let me contact her to get the printer's contact. 

We will be collecting the wedding cards this saturday! Yippeee! Next to do is arrange for food tasting.

* First furniture bought for our house *

Was chatting with my sis, Anah, when I realise I forgot to blog this down. We bought the first furniture for our love nest and that is... MATTRESS.

Yesh even before our renovation works start we bought our mattress already. Why the rush? My hubbie has spine problem so he need to sleep on hard mattress. He like the Sea Horse brand and now Sea Horse is having 50% storewide so we take this opportunity to get our mattress first. 

We got their "High Resilience Mattress" @ $599 after 50% discount, 2 pillows @ $29 each after 50%, a mattress protector and a queen size quilt cover set for $35.

Total damage: approx ~$720

They can hold our mattress for 2 months so the delivery date would be 18 Apr 2009. Hopefully, our house is ready then... pray hard (**cross finger **)